The Scaffolding is usually found in all big events construction, so how to assemble the Scaffolding System quickly and effectively? ITSC truss group is now offering you a simple but clear steps of how to assemble. If need more information, our engineers are always on service for your questions.
Here are the steps of how to Assemble the Scaffolding:


| Main tube diameter | 48.3mm |
| Main tube thickness | 3.2mm |
| Ring Thickness | 9.82mm |
| Material | Q345 or Q235 |
| Finished | Hot-Dip Galvanized |
The Pipes are the main parts for the Ringlock Scaffolding and beflow is information for them:
| Horizontal Pipe(L02) | 2400mm*3.5T | ITSC-L02-P24 | 9.41kg |
| 1800mm*3.5T | ITSC-L02-P18 | 7.27kg | |
| 1200mm*3.5T | ITSC-L02-P12 | 5.10kg | |
| 900mm*3.5T | ITSC-L02-P09 | 4.04kg | |
| Diagonal Pipe(L03) | 2400mm(W)*2000(H)*2.3T | ITSC-L03-D2424 | 9.23kg |
| 2400(W)*1500(H)mm*2.3T | ITSC-L03-D2415 | 8.43kg | |
| 1800(W)*1500(H)mm*2.3T | ITSC-L03-D1815 | 7.20kg | |
| Vertical Pipe(L04) | Ò48*3000mm*3.5T | ITSC-L04-V30 | 14.23kg |
| Ò48*2500mm*3.5T | ITSC-L04-V25 | 12.00kg | |
| Ò48*2000mm*3.5T | ITSC-L04-V20 | 9.73kg | |
| Ò48*1500mm*3.5T | ITSC-L04-V15 | 7.33kg | |
| Ò48*1000mm*3.5T | ITSC-L04-V10 | 5.07kg | |
| Ò48*500mm*3.5T | ITSC-L04-V05 | 2.3kg |
Testing the thickness with a tool:


Vivi Photos


For Mobile Stages Structure

For Working Platform Tower Structure

For LED Screen Display and Stage Lighting Backdrop Structure

Combined with the Aluminum lighting Trussing and Mobile Staging together for Big Concerts

For Arean Seating Stage System Structure